
STUDIO NOIR · HVAC and Cleaning
Owner: Trill Walker (CSO) Phase 1, Director of Facilities Phase 2. Standard: hospitality-grade cleanliness, appropriate airflow for pole classes. Members never see a cart, a mop bucket, or a chemical smell.
Phase 1 is simple: existing landlord HVAC, contracted cleaning service 2x/week, class-day pole and floor wipe-down by instructors.
Phase 2 flagship expands into pandemic-grade air handling, hospital-grade sanitation, dedicated overnight cleaning crew.
1. Phase 1 HVAC
Design intent (existing landlord HVAC)
The Phase 1 boutique relies on the leased space’s existing HVAC. Pre-lease check confirms it can hold: - Studio floor at 68-72°F during a hot pole class of 12 people - Reception at 70°F - Restrooms at 70°F - Humidity acceptable range 40-55% (pole studios prefer top of range for grip)
Verification pre-lease
Licensed HVAC contractor walks the property before LOI signing. Verifies: - Existing system rated for the target square footage and occupancy - Can maintain setpoint during peak load (class of 10-14 doing cardio-level work) - Filter is currently MERV 8 or better (standard commercial)
If HVAC is marginal: - Option 1: Supplemental spot cooling (portable unit or ceiling mini-split), $2K-$5K in buildout budget contingency - Option 2: Landlord upgrades the HVAC as part of lease negotiation (rare on small leases) - Option 3: Walk from the property
Ongoing HVAC service Phase 1
- Quarterly: HVAC service contractor visit for filter change, coil clean, thermostat calibration ($150-$300 per visit, $600-$1,200 annually — falls in normal opex)
- Filter grade: MERV 8 minimum, MERV 11 preferred, MERV 13 optimal (higher grade filters are better but reduce airflow; verify system can handle before upgrading)
- Emergency service: HVAC contractor available for same-day call ($150-$300 per emergency visit)
CO2 monitoring Phase 1
Simple wall-mounted CO2 monitor at the studio (approx $150). Watch for readings above 1,000 ppm during peak classes. If frequently high, increase airflow or reduce class capacity.
2. Phase 1 zone setpoints
| Zone | Temperature | Notes |
|---|---|---|
| Reception | 70°F | Warm and comfortable, dimmable HVAC control |
| Studio floor | 68-72°F | Adjustable pre-class based on instructor’s read of member energy |
| Restrooms | 70°F | Standard comfort |
Phase 2 adds detailed multi-zone setpoints (recovery wing at 72°F, cold plunge deck at 45°F ambient, sauna at 175°F, cafe at 70°F, broadcast control room at 68°F).
3. Phase 1 cleaning cadence
Between-class cleaning (executed by class instructor)
After each class ends: - Pole rigs wiped with 70% isopropyl on lint-free microfiber (base to top) - Sprung floor swept - Mirror wall wiped if smudged - Mats/props sanitized with Force of Nature hypochlorous solution - HVAC ventilation cycle for 5 minutes (higher airflow)
Time: 15 minutes.
Post-final class of the day cleaning
- Full studio floor sweep + damp-mop
- Restroom touch-up (sink, toilet, floor)
- Reception polish
- Trash out
- Prosecco flutes to a hand-wash sink (hand-washed, polished with linen)
- Music transitioned off, lighting to overnight setting
Time: 20-30 minutes. Done by class instructor or Studio Manager.
Twice-weekly deep clean (external cleaning service)
Contracted cleaning service comes 2x per week overnight (typically Monday and Thursday nights):
- Full mop of all floors (Bona Pro on the sprung/marley studio floor; standard commercial cleaner elsewhere)
- Full restroom deep clean (toilets, sinks, mirrors, floors, fixtures, grout)
- Locker area cleaning
- Reception polish (oak desk, mirror, hardware)
- Trash out, recycling out
- Restock cleaning supplies at the staff cabinet
- Note any issues (broken fixtures, low supply) to Studio Manager
Cost: $400/month contract.
Weekly Studio Manager quality check
Every Tuesday morning, Studio Manager walks the space: - Floors clean, no debris - Restrooms fully stocked - Cleaning supplies at appropriate levels - Any concerns escalated to cleaning service or Trill
4. Phase 1 cleaning product spec
STUDIO NOIR uses professional-grade, EPA-registered chemistry. Products staged in staff-only cabinets, never in view of members.
Approved products Phase 1
- Pole grip-safe cleaner: 70% isopropyl alcohol on lint-free microfiber. No detergents. No residue. Used between users on pole surface.
- Multi-surface disinfectant: Force of Nature hypochlorous solution (odor-free, safe, EPA-registered). Used on mats, props, gym surfaces.
- Wood floor cleaner (sprung floor): Bona SuperCourt or Bona Pro, diluted per spec, microfiber flat mop.
- Bathroom cleaner: Method Daily Shower + Ecolab Neutral Disinfectant Cleaner for daily wipe. Ecolab Bowl Cleaner for toilets.
- Glass and mirror: Method Glass + Microfiber (never paper).
- Stainless / hardware polish: Ecolab Facilipro Stainless Steel Cleaner Polish.
Application standards Phase 1
- Color-coded microfiber: yellow for general surfaces, red for restrooms. Never crossed.
- Microfiber laundered by cleaning service twice weekly.
- No aerosol cans on the floor during member hours.
- No chemical smell perceptible to members at any time.
5. Phase 1 water systems
Standard commercial plumbing (landlord’s existing):
- Hot water at showers (if any): 104-108°F, tempered by mixing valve
- Cold water at sink: standard commercial supply
- No cold plunge Phase 1
- No steam room Phase 1
- Restroom fixtures: kohler/toto commercial spec, cleaned twice weekly
No specialty water treatment Phase 1 (no cold plunge chemistry, no Legionella-scale hot water loop).
6. Linen and laundry Phase 1
Minimal Phase 1:
- Hand towels (bathroom): Frette or Sferra tier hand towels, laundered by an external laundry service (either the cleaning service or a dedicated linen service) weekly. Approximately 40-60 hand towels in rotation.
- No robes stocked (Phase 2 amenity)
- No practice kits stocked (members bring their own)
- No towels for showers (no showers Phase 1)
Small linen expense: $50-100/month for laundering.
7. Pest and odor management Phase 1
- Basic pest management: if any issue, call an exterminator. Not a monthly contract Phase 1.
- Odor management: signature scent handled by Aera diffuser at reception (see 04_SIGNATURE_AMENITIES). Beyond that, airflow + cleaning is the fix, not fragrance masking.
- Any staff or member complaint about scent triggers a same-day investigation by Studio Manager.
8. Phase 1 audits
- Weekly: Studio Manager Tuesday morning walk-through
- Monthly: Trill on-site review
- Quarterly: HVAC contractor visit (filter change + service check)
- Annually: Full insurance walkthrough
9. Phase 2 HVAC and cleaning (preserved for reference)
Phase 2 flagship HVAC is a fundamentally different scope. Full spec preserved from earlier planning:
Phase 2 HVAC design intent
- Remove airborne pathogens, allergens, combustion byproducts
- Hold precise temperature and humidity per zone (10+ zones)
- CO2 kept below 900 ppm in all guest zones
- Whisper-quiet: under NC 30 in guest zones, NC 35 on training floor
- MERV 14 filtration with UV-C germicidal lamps
- Bipolar or needlepoint ionization (UL 2998 zero ozone certified)
- Dedicated Outdoor Air System (DOAS) with ERV
- 6 ACH minimum in guest zones, 8 ACH in training studios, 12 ACH end-of-class purge
Phase 2 zone setpoints
Lobby 70°F, main training floor 68°F, pole studios 74-76°F at 40-55% RH, secondary studio (heated) programmable 78-92°F, gym 66°F, recovery wing zone-specific (sauna 175-195°F, steam 110-115°F 100% humidity, cold plunge water 38-42°F, ambient 65°F 40-50% RH), locker rooms 72°F 50-60% RH, café 70°F, broadcast control room 68°F.
Phase 2 water systems
- Domestic hot water 104-108°F at showers, recirculation loop with Legionella testing quarterly
- Cold plunge: 10-20 micron pre-filter + UV + ozone + secondary sanitizer, chemistry logged 4x daily (free chlorine 1.0-3.0 ppm, pH 7.2-7.6, ORP >650 mV, total alkalinity 80-120 ppm), weekly deep sanitation cycle, quarterly full drain
- Steam generator descaled quarterly
- Grease trap 1,500 gallon exterior for café
Phase 2 cleaning
- Between-class turnover per detailed cart-based procedures (Bar Keepers Friend paste for pole grip residue, isopropyl mist, dry polish, Bona Pro on wood floors, Diversey Oxivir Tb electrostatic spray on mats)
- Overnight deep clean by dedicated contracted crew (4-5 person crew)
- Full color-coded microfiber system (blue glass, yellow general, red restroom, green café)
- Autoscrubber for main floor + locker room tile
- Weekly shower descale, grout treatment
- Nightly drain enzymatic treatment
- Sauna cedar wipe + cedar oil buff between cycles
- Cold plunge chemistry log every 45 min during peak
- Recovery deck deep clean overnight
- Aerial silks laundered in dedicated washer (Ecos Pro detergent, air dry, never machine dry)
- Robe/towel program (no reuse, sent to linen vendor daily)
Phase 2 pest and odor
- Integrated pest management contract (annual, monthly service visits)
- Legionella testing quarterly by accredited lab
- Duct interior inspected every 3 years by camera, NADCA cleaning on any finding
- HVAC recommissioning every 3 years
Phase 2 signage and audits
- Full third-party mystery guest program (4 visits/month)
- Environmental services audit annually by cleaning vendor field supervisor
- Full HVAC preventive maintenance quarterly by mechanical contractor with photo-documented reports
Full Phase 2 HVAC and cleaning spec rebuilt in 2028 alongside Phase 2 buildout and staffing.